A focused startup website takes two to six weeks from kickoff to launch, and most of that time goes on waiting for words and decisions rather than on design. At our studio a site of five or six pages ships in two to four weeks, provided the copy and the brand are already sorted.
If they aren’t, the clock runs longer. The rest of this post is about where the days actually go.
What does the schedule look like?
Say you’re a pre-seed team with a working product, a rough pitch deck and a launch date six weeks out. Here is roughly how we’d plan a site of around five pages. The stages overlap a little, so the rows won’t add up to a tidy total.
| Stage | Typical time |
|---|---|
| Kickoff and site structure | 2 to 3 days |
| Copy, if it still needs writing or editing | 1 to 2 weeks |
| Design in Figma | 1 to 2 weeks |
| Build in Framer or Webflow | 3 to 7 days |
| Review, fixes and launch | 3 to 5 days |
Design and build together are often under three weeks. Everything else is the work around them, and it’s where projects tend to drift.
One caution about the table. These are working days of effort spread across calendar time, and calendar time is longer. A review that needs two hours from you can sit for three days while a busy founder gets to it, and nobody has done anything wrong. We plan for that gap rather than pretend it isn’t there.
Time and money move together, because a longer project is usually a more expensive one. If you’re planning a budget as well as a calendar, what a startup website costs goes through that side of it.
How long does the design take?
One to two weeks for a first full pass, assuming the structure is agreed. We work in Figma, and you see real pages early instead of a mood board followed by a big reveal. We prefer it this way. The first reaction to an actual page is more useful than the tenth reaction to a description of one.
Design time stretches when the pages are being invented while they’re being designed. If nobody has decided whether pricing goes on the site, or which customer the homepage is talking to, the designer ends up guessing. Guesses get redone, and each redo costs a couple of days.
Feedback rounds matter here too. Two rounds is normal: one on the overall direction and one on the details. A third is fine when something real changed, like a new pricing model. Past that, you’re usually editing taste rather than fixing problems, and the schedule slips a few days at a time.
How long does the build take?
Three to seven days for most marketing sites. We build in Framer or Webflow, so the design goes straight into the tool your team will edit afterwards. There’s no handover of a file and a wait for someone else to rebuild it.
Something custom is a different project. A logged-in area, or a calculator that talks to your backend, means writing code in something like Next.js, and the timing isn’t comparable. Framer, Webflow or code covers how we decide which way to go.
What makes it slower?
Four things, roughly in this order.
Copy is the first. A site needs words, and founders tend to assume the words will turn up somewhere between design and build. They don’t. If nobody owns the copy, the project waits for it, and a week of waiting looks exactly like a week of work on the calendar. If you’d rather not write it yourself, say so on day one and we’ll plan the time for it.
Feedback in pieces is the second. One round from three people on the same afternoon is fast. Three rounds from one person spread over ten days, each contradicting the last, is slow. Pick a single person who gives the final word.
The third is a brand that is still moving. If the logo, colours and typefaces are undecided, the site either waits for them or gets designed twice. This is why a young company sometimes does brand work first, and then the website goes quickly.
The fourth is scope that grows after kickoff. A fifth page becomes nine. A blog appears. A careers section gets added because someone on the team asked. None of these is wrong, but each adds days, and they pile up without anyone deciding to. Write the page list down at kickoff, and treat anything new as a swap or a later phase.
Can it go faster?
Yes, and it costs you preparation more than money.
Bring the copy, or at least an honest outline of it. Name one decision-maker. Send the things we’d otherwise spend days chasing: logo files, screenshots of the product, the pitch deck, a few sites you like and a few you can’t stand. Set aside two or three hours a week for reviews. A good brief saves days at the very start too, and how to brief a design studio lists what’s worth including.
We’d also cut the page count. A homepage, a page about the product, pricing, an about page and a contact page is a real website. You can add the rest after launch, once you can see what visitors actually look for. Google Search Console starts showing you that within a few weeks of going live.
What we wouldn’t do is shrink the review stage to hit a date. Broken mobile menus and contact forms that don’t send are the usual casualties of a rushed launch, and they take longer to fix in public than they would have taken to check in private.
If you have a hard deadline, such as a demo day or a press mention, tell us early. We’d rather build a small, sharp site for that date and grow it afterwards than stretch a bigger one across it.
Questions people ask
Can a startup website be done in a week?
Yes, if it’s a single page, the copy already exists and you can live with one round of feedback. That’s a landing page, not a full site. We’d only suggest it when a fixed date forces the issue, and then plan to build the fuller version afterwards.
Does the site need to be finished before we launch the product?
No. A live page that says clearly what you do and how to reach you is enough to start. Waiting for a perfect site is how teams end up with a placeholder for months. Launch the small version and add pages as real questions come in.
Should the website come before or after the brand?
After the basics, at least. You need a name, a logo direction, a colour palette and a typeface before the site can be designed properly. They don’t all have to be final, but they do have to hold still for a few weeks. If they won’t, do the brand first.